PPE Standards

Quick answer

Steel-toe boots and hi-vis on the ops floor; safety glasses in all fabrication zones.

Full procedure

  1. 1Review the PPE Standards standard on the department portal before you begin.
  2. 2Confirm you have the required access, PPE, or tooling for the task.
  3. 3Steel-toe boots and hi-vis on the ops floor; safety glasses in all fabrication zones.
  4. 4Complete each step in sequence — do not skip or reorder.
  5. 5Record completion in the system of record (log, ticket, or checklist).
  6. 6Escalate any deviation from the standard through the escalation path.
  7. 7Debrief the team lead at handoff on anything unusual.

Common mistakes & exceptions

  • Skipping the WMS/system logging step — every action must have a system record.
  • Not photographing exceptions before escalating.
  • Assuming verbal approval is enough — always capture the ticket or form ID.

Escalation path & subject matter expert

Escalate to
Safety Shift Lead
Ext. 4121 · Slack #safety
Subject matter expert
Priya R. — Safety

Frequently asked questions

Required forms

  • PPE Standards Log
    SAF-258

My private notes

Revision history

  1. 2026-11-21
    Version 1.3 republished by Sofia Marquez.
  2. 2025-06-08
    Reviewed for annual compliance.
  3. 2024-11-04
    Initial publication.
Was this helpful?
Your feedback improves the knowledge base.