15 results for “dock lighting”
Sorted by relevanceReview the Dock Lighting Standards standard on the department portal before you begin.
Coordination of inbound and outbound truck traffic at the loading dock. Covers appointment windows, dock assignment, and driver check-in.
All inbound blue containers are received at Dock 3. Scan the container barcode into the WMS, inspect the seal, then route to Staging Zone B for putaway.
Facilities inspects dock doors monthly for balance and cable wear.
Cross-dock freight bypasses storage; move within 4 hours of receipt.
Cross-dock freight bypasses storage; move within 4 hours of receipt.
Submit lighting retrofit requests through the Facilities portal with a photo.
Review the Loading Dock Safety standard on the department portal before you begin.
Book dock windows in DockPlanner; each appointment is 60 minutes with a 15-minute buffer.
Choose the category (HVAC, Plumbing, Lighting, Doors, Other).
Choose the right dock mode. This procedure documents scope, roles, decision points, and the recordkeeping required to stay compliant with Atlas Operations standards. Owned by IT Service Management.
Customer returns are received at Dock 5 and staged for QC inspection.
Verify appointment in WMS, meet driver at assigned dock, inspect and scan every unit before signing the BOL.
Standardize how internal teams request outbound shipments so carriers and dock crews can plan. This procedure documents scope, roles, decision points, and the recordkeeping required to stay compliant with Atlas Operations standards. Owned by Customer Experience.
Bin locations follow AISLE-BAY-LEVEL-POSITION, e.g. A-12-3-2.