17 results for “send package

Sorted by relevance
34 related concepts matched using semantic search
99%
OperationsMatch: OverviewUpdated Jun 14, 2026312 saved
Receiving Blue Containers

Standard intake process for all inbound blue containers arriving at the north dock. Ensures every package, pallet, and freight shipment is logged, inspected, and routed correctly.

shipmentshipmentsshippingpackagepackagesblue container
83%
OperationsMatch: Quick answerUpdated Aug 19, 2025114 saved
Shipping Requests

Submit a Shipping Request in the WMS at least 4 hours before pickup with cost center, weight, and carrier.

send packageshipshipping
73%
OperationsMatch: Quick answerUpdated May 19, 2026158 saved
Shipping Requests

Open the Ship-It portal, choose Parcel or Freight, enter the destination and cost center, and drop the package at the outbound cage by 15:00.

sendshippingshipshipmentshipmentspackage
57%
OperationsMatch: Quick answerUpdated Apr 2, 2026102 saved
Package Receiving (Mailroom)

The mailroom scans every inbound parcel into the Package Log and sends a pickup notification email within 30 minutes.

shipmentpackagepackages
34%
OperationsMatch: Step 1Updated Aug 4, 2025168 saved
Package Routing

Review the Package Routing standard on the department portal before you begin.

package
32%
OperationsMatch: Quick answerUpdated Oct 10, 2025208 saved
Container Management

All reusable containers are tracked in AssetHub; scan in on arrival and scan out when routed to a destination bin.

containercontainers
25%
OperationsMatch: Step 5Updated Apr 30, 2026122 saved
Loading Dock Deliveries

Unloading proceeds per the Receiving Blue Containers SOP.

shipmentshipping
25%
OperationsMatch: FAQUpdated Oct 13, 2025322 saved
Receiving Deliveries

How do I receive a shipment? — Verify appointment in WMS, meet driver at assigned dock, inspect and scan every unit before signing the BOL.

shipmentaccept shipment
24%
OperationsMatch: Quick answerUpdated Dec 26, 2025162 saved
Container Seal Verification

Verify seal number matches BOL before opening any container.

container
22%
OperationsMatch: OverviewUpdated May 1, 202651 saved
Shift Closing

Standardize how shifts end so the next crew inherits a safe, ordered floor. This procedure documents scope, roles, decision points, and the recordkeeping required to stay compliant with Atlas Operations standards. Owned by Quality Systems.

end of shift
18%
OperationsMatch: Quick answerUpdated Mar 17, 2026349 saved
Hazmat Shipping

Only DOT-certified associates ship hazmat; use IATA labels and Form HAZ-77.

shipping
17%
TrainingMatch: OverviewUpdated Jul 11, 202654 saved
New Manager Bootcamp

Newly promoted managers attend a 2-day bootcamp within 60 days. This procedure covers scope, required roles, and the recordkeeping needed to stay compliant with Atlas Operations standards.

leadership
17%
OperationsMatch: OverviewUpdated Jul 6, 2026237 saved
Packing Standards

Standardize packing. This procedure documents scope, roles, decision points, and the recordkeeping required to stay compliant with Atlas Operations standards. Owned by Quality Systems.

slip
17%
TechnologyMatch: Quick answerUpdated Apr 15, 2025298 saved
Distribution List Management

Owners review DL membership every 6 months.

membership
17%
TrainingMatch: Step 1Updated Jun 12, 2025104 saved
Leadership Development

Review the Leadership Development standard on the department portal before you begin.

leadership
17%
TrainingMatch: Quick answerUpdated Dec 18, 2025152 saved
Mentorship Program

Sign up for mentorship in Workday; matched within 4 weeks.

mentorship
11%
TechnologyMatch: Quick answerUpdated Jul 11, 202654 saved
Phishing Report Procedure

Use the Report Phish button in Outlook to send suspicious emails to Security.